Project name: Complete oil filing of Layla project BSP Substation.
Project Description:
Supply of electrical equipment & oil filling
Ø Supply of Filtration machine with operator.
Ø Oil breakdown tester.
Ø Oil storage tank.
Ø Vacuum machine with vacuum gauge.
Ø Operator for Oil Machine.
Project name: Overhead upgrading at dairy farm No.6; Replacement of 33kv post insulator, top tie & armor rod at Nadec city.
Project Description:
Ø Post insulator
1320mm(1008pcs) distance as SEC STD.
Ø Armor Rod
(1008pcs) for merlin conductor as per SEC STD.
Ø Top tie (1008pcs) for merlin with armor hosting as per SEC STD.
Ø Replacement of post insulators (168 poles).
Project name:
Oil leak repair and oil filtration and electrical testing of 1600 KVA transformers.
Project Description:
Ø Visual inspection of transformers.
Ø Check for any damage/leakage.
Ø Draining old oil from transformer.
Ø BDV Test before and after filtration.
ØOil circulating in oil storage tank.
Ø Electrical testing as per IEC standard.
Ø Mobilization and demobilization of team and tools.
Project name: Supply of OTP with oil storage tank with operator for oil treatment activity 6500 Liter.
Project Description:
Ø Visual inspection of transformers.
Ø Supply of OTP and oil storage tank.
Ø Oil circulation in main tank
Ø oil filling of new oil(if required)
Ø Energization of Transformer
Ø Equipment to carry out the Job such, as follows:
Ø 2,000-4,000 L/H Oil treatment plant with the accessories.
Ø Roots pumps and booster.
Project name: Ground and Breaker testing
Project Description:
Ø EXP-SAFTY-CNSMB-059
Ground resistance test (Earth Test)
Ø EXP-SAFTY-CNSMB-060
Breaker testing
Ø EXP-SAFTY-CNSMB-061
Mobilization and Demobilization to site.
Project name: Oil circulation and testing (oil & electrical) of auxiliary transformers.
Project Description:
Ø Visual inspection of transformers.
Ø Supply of OTP and oil storage tank.
Ø Oil circulation inside the transformer winding until it reaches up to the accepted value.
Ø Filtration of oil in the transformers to remove moisture from winding and insulation paper.
Ø DGA testing after circulation.
Ø Energization of Transformer.
Project name: Rental supply of equipment, operator and testing transformers.
Project Description:
Ø Testing of transformer: BDV Moisture and DGA tests.
Ø Operating and supervising of OTP
Ø supply of flanges, hoses and vacuum, gauge digital.
Ø Mobilization and Demobilization of equipment.
Project name: ELECTRICAL TESTING OF TRANSFROMER
Project Description:
Ø TESTING OF TRANSFORMERS
Ø INSULATION RESISTANCE TEST
Ø POLARIZATION INDEX
Ø WINDING RESISTANCE
Ø TURN RATION TEST
Project name: Supply of accumulator
Project Description:
Ø ACCUMULATOR ,CAPACITY;200 LTR, PRESSURE; 10 BAR, FOR FIREFIGHTING SYSTEM,
Ø MODEL: AF-CE 200 LITR
Ø FLUID GROUP 2 / PT: 14.03 BAR/ MEMBRANE: EPDM/
Ø MAX PR: 10 BAR
Ø PRESSURE TANK AF 200 V CE 1 OBAR
Project name: Testing of three transformers and Installation of termination kits.
Project Description:
Ø Transformer Oil Testing
(BDV Test Supply of Oil Sample Kits.)
Ø Electrical testing
✓ Transformer Turn Ratio.
✓ Winding Resistance.
✓ Insulation Resistance.
ØInstallation of MV terminations 120mm 3core.
Project name: Oil filtration 7200KVA of transformer.
Project Description:
Ø Visual inspection of transformers.
Ø Supply of OTP and oil storage tank.
Ø Oil circulation inside the transformer winding until it reaches up to the accepted value.
Ø Filtration of oil in the transformers to remove moisture from winding and insulation paper.
Ø BDV testing after circulation.
Ø Energization of Transformer.
Project name: MV Cables Termination
Project description:
Ø Installation of Raychem termination kit.
• 3CX300sq.mm
Ø Installation of Raychem termination kit.
• 3X1CX240sq.mm
Ø Installation of Raychem termination kit.
• 3X1CX95sq.mm
Project Name: Installation of 01 Unit Transformer- 70.00 Ton (Main Body)
Project description:
Ø Removal of 01 X 70 Ton Transformer (Main Body without Oil) from foundation,
Ø Loading onto a hydraulic trailer and shifting to the yard (within 10 KM radius) from the foundation.
Ø Jack down onto the ground.
Ø Loading of 01 X 70 Ton Transformer (Main Body without Oil) onto the suitable trailer.
Ø Shifting (within 02 KM radius) and Installation onto foundation.
Project name: Removal and Installation of 31 MVA Transformer
Project description:
Ø Removal of 31MVA Transformer from foundation,
Ø Loading onto hydraulic trailer and shifting to yard (within 10 KM radius) from the foundation.
Ø Jack down onto ground.
Ø Loading of 31MVA Transformer (Main Body without Oil) onto suitable trailer.
Ø Shifting (within 02 KM radius) and Installation onto foundation.
Project Name: Order to Repair & change oil for the said transformers at Haradh
Project Description:
Ø DP2 Transformer Maintenance, 2000 kVA, - 4 Nos-4-units For DAIRY PLANT (maintenance with oil replace & oil leakage test).
Ø Maintenance and Services of Transformer 2000 KVA-2-Units for Dairy Farm ((maintenance with oil replace & oil leakage test).
Project Name: ELE SERV: Alternate power
supply connection 11kv to admin
building from packing plant Line
Project Description:
ØConnect 2nd power source (11KV) to theRMU (630A SafeLink ABB) installed at admin area substation.
ØASPHALT AND SAND DIGGING FOR JOINT
ØMake a T-joint from the existing powercable 3x300mm² & connect to the existing RM.
ØSupply and installation of joint (maderaychem).
ØIR & Hipot test will be done on existingpower cable before & after the joint,values should be in standard range.
Project Name: Electrical Testing & oil Testing of 1500KVA Transformer
Project Description:
1) Electrical testing
Ø Transformer Turn Ratio.
Ø Winding Resistance.
Ø Insulation Resistance.
2) Oil Testing
Ø DGA (from Third Party Lab)
Ø Break Down Voltage
Ø Supply of Oil Sample Kits.
3) Study and setting of Relay coordination.
Project Name: Installation, testing and commissioning of unit substation
Project Description:
Ø Installation of (3*300mm2) CU/XLPE/PVC/STA(armoured cable) 15KV cable.
Ø Supply and installation on termination
Kits.
Ø Testing of cable
✓ Hipot Test.
✓ Megger of cabel
Project Name: Dismantling of 200 MVA Mitsubishi japan Transformer at SEC sub Station Khulais & Mobilization of Transformer to Tssd Yard Jeddah for Repairing.
Project Description:
Ø Dismantling and pack accessories of Transformer
Ø Transportation of Transformer SEC to TSSD Yard Jeddah with Special road permits.
Project name: Supply of LV bushing
Project description:
Ø Supply of LV BUSHING 3kV/2500A(4TO) CREEPAGE=125
Project name: Oil filling of transformers (1000-3000 KVA)
Project description:
✓ Visual inspection of transformers.
✓ Supply of OTP and oil storage tank.
✓ Oil circulation & oil filling of new oil
✓ Calibrate all the Aux Devices.
✓ Energization of Transformer
Project name: SWCC Jeddah installation of New Transformer 250 MVA
Project description:
Ø Dismantling of 250 MVA Transformer Foundation to SWCC Scrap Yard.
Ø Transportation of New Transformer 250MVA
SWCC Yard to Foundation.
Installation of Transformer on Foundation.
Project name: Overhauling Of 38 Distribution Transformer
Project description:
Ø Replacement of Gasket sets,
Ø Testing of Transformer.
Ø Testing of the transformer as per manufacturer standards.
Ø Insulation Resistance Testing and polarization index testing.
Ø Winding Resistance Test and Turns Ratio Test
Ø Functional Test for relevant Transformers protective devices
ØOil Circulation in Transformer Tanks ØOil Sampling for Lab.
Project name: Supply of LV Panel & mobilization to site
Project description:
Ø MDB1 (Line)
Ø MDB2 (Services)
Ø PP-AHU, S
Project description
Installation of Indoor Termination Kits
Project Name: Supply and installation of CT-Panels
Project description:
Ø Supply and installation of Outdoor CT BOX
Project name: Repairing of leakage & maintenance of 2 MV A Transformer
Project description:
Ø Repairing of leakage & maintenance of 2 MVA Transformer
Ø Replacement of oil reduction relay
Project Name: Supply of MV Terminations Kits
Project description:
Ø Supply of MV Terminations Kits • Cooper DT436T-G-185, 36kv, 630A, T-connector suitable for 1C x 185 mm² cable.
Ø W/ Capacitive Test Point and Bimetallic cable lug.
Insulation Range: 30.9 - 36.2 mm
Project Name: Maintenance of transformer
Project description:
Ø Repairing of leakage & maintenance of Transformer - Brand Name: Saudi Federal Transformers LLC - Includes (
Ø Visual inspection of transformer. Change of gasket set.
Ø Oil circulation & oil filling of new oil Testing of Transformers as per manufacture standard.
Ø Transformer Turn ratio Test.
Ø Measurement of winding Resistance.
Ø Measurement of insulation Test.
Ø Oil Break Down Voltage test
Project Name: Installation of cable and excavation and backfilling
Project description:
Ø Installation of (3*300mm2) CU/XLPE/PVC/STA (armored cable) 15KV cable. Supply and installation of termination kits.
Ø E Testing of cable
Ø Hipot Test.
Ø Megger test of cables
Project Name: Supply of CT, VT, and fuses
Project description:
Ø Cast indoor resin application.
Ø Current transformer for
Window-type-current transformer· ksoh 1555
Ø Cast resin voltage transformer for indoor application, block type - ritz instrument
Ø Fuse for VT’s
Ø Abb surge arrestor
Ø Installation & commissioning, testing
Project Name: SWCC Project of terminations
Project description:
Ø Installation of cables and termination Kits
Project Name: Oil Filtration and Maintenance of Three Transformers (1000 KVA, 1500KVA, 2000 KVA)
Project description:
Ø Drain of old oil from Transformer.
Ø Filling of new oil from drum to transformer.
Ø Oil Filtration inside the winding tank to remove the moisture from winding until reaches acceptable values.
Ø Venting of Transformer.
Ø Oil Breakdown test prior to filtration and after filtration.
Your partner in maintenance and services
Project Name: SF6 Gas Refilling
Project description:
Ø ABB RMU N-103094.001 SF6 Gas Refilling at UMMOSHAR SITE
Project Name: Arabian Cement
Project description:
Ø Removal of 31 MVA Transformer from foundation and shifting to yard (within 10 KM radius) and Installation of new transformer.
Ø Testing, commissioning and installation of 31MVA transformer.